Does this sound familiar?
If even one of these situations feels familiar, it is worth spending 30 minutes to see whether CER fits your environment. If it does not, we will tell you that as well.
CER is a controlled SAP gateway layer where every material master record passes through a validated, auditable process before entering the ERP. Errors are stopped at the source, and process lead times are reduced from days to hours.
SAP gateway layer · ready-to-deploy, customizable framework · 45 → 4.5 days
30 minutes · online · no obligation
CER is not a replacement for SAP, and it is not a parallel database. It sits in front of SAP: errors are filtered where they originate instead of being corrected later at a much higher cost.
The question is not only whether the process works, but how controlled, auditable, and scalable it is.
BPMN-based process steps and control points, including complex approval paths.
Every field is validated during entry — invalid data never enters the process.
Who changed what and when — every modification is recorded.
Real-time updates on process status and required actions.
Users only see the fields relevant to their responsibilities — reducing unnecessary steps.
Natural-language search and real-time KPI visibility.
Seamless two-way synchronization with the ERP system.
A clean interface tailored to the company’s visual identity.
Does this sound familiar?
If even one of these situations feels familiar, it is worth spending 30 minutes to see whether CER fits your environment. If it does not, we will tell you that as well.
The lead metric comes from a real implementation. The others represent typical, achievable outcomes rather than guarantees.
days — process lead time (real implementation)
lead time reduction
duplicate records — controlled creation
controlled process — from creation to SAP
This is the most common situation. The intention is there, executive support is there, but deciding between CER, an international alternative, or a custom-built solution is difficult from the outside. In a 30-minute consultation, we help you evaluate those options.
Implementation typically takes 4–8 weeks in a 200–500 employee organization. Deployment can be on-premise or in a Hungarian ISO-certified private cloud — with your data remaining under your control at all times.
A controlled entry point with role-based access.
The system filters incomplete or invalid data during entry.
BPMN-based approval steps, control points, and complete traceability.
Approved and validated data is transferred seamlessly into the ERP.
Every future modification follows the same controlled and fully logged process.
Errors are stopped where they originate — only validated data reaches SAP.
We do not simply hand over software. We build the solution together with your organization and adapt it to your processes.
In a real implementation, process lead time was reduced from 45 days to 4.5 days.
Download the complete product overview — easy to read offline and simple to share with colleagues and decision-makers.
CER does not replace it — it sits before it. The SAP module manages storage, while CER manages controlled creation and validation before data enters the ERP.
Quite the opposite. Users only see the fields relevant to them, resulting in fewer clicks and a faster, more reliable process.
CER is primarily designed as an SAP gateway layer, but the framework can also be integrated with other ERP platforms.
CER is not a boxed product. The implementation is built together with your organization and tailored to your processes.
In 30 minutes, we will show where time is leaking from your material master data process — and what an SAP gateway layer can solve.
Do not let bad data surface inside SAP.
Fill out the form below and we will contact you within 24 hours, or download the detailed “CER — Material Master Data Gateway”product overview.



